/

Standing seam metal roof

Sellwood Standing Seam

A low-slope modern addition needed a roof that could take four months of rain without a single exposed fastener. Panels were roll-formed on site.

Sellwood Standing Seam

Why metal

A low-slope modern addition with a long unbroken run needed a covering that could take four months of Pacific Northwest rain with no exposed fasteners anywhere in the field.

On-site fabrication

Panels were roll-formed on site to the exact length of the run, eliminating every horizontal seam. Each panel is mechanically seamed and clipped, so the roof can move with temperature without loosening a single fixing.

The finished assembly carries a 40-year finish warranty and should outlast two asphalt roofs on the same house.

Project record

Location

Sellwood, Portland

Scope

Standing seam metal roof

Materials

24-gauge steel, mechanically seamed

Duration

12 days

Completed

2025

Evidence / Same vantage point

Drag the line.

Photographed from the same position before demolition and after the final walk‑through. Nothing is retouched or staged.

After renovation
Before renovation
Before
After
Before
Low-slope run with exposed fasteners and standing water
After
24 ga panels roll-formed on site, mechanically seamed
Standing seam metal roof
Sellwood, Portland
a large metal structure with a clock on it's side

Next step

Want this level of documentation on your house?

Every Ridgeline project ends with a photo record of the layers you cannot see. Start with a walk‑through.

Create a free website with Framer, the website builder loved by startups, designers and agencies.