Roofing & exteriors — Portland, OR

A roof is not a line item. It is the thing keeping everything else dry.

We tear off, inspect the deck, and rebuild the assembly properly — then hand you photographs of every layer you paid for. Fixed written pricing before we start.

612

Roofs completed since 2009

15 yr

Workmanship warranty, in writing

4.9 / 5

Across 240 verified reviews

Tudor home with a newly completed asphalt roof

Alameda Ridge

Full tear‑off & reroof · 8 days

Licensed, bonded, insured

CCB #241866 in Oregon and Washington. Certificates sent with every estimate.

Fixed written pricing

The number on your estimate is the number on your invoice unless you approve a change.

Manufacturer certified

Certified installers, which is what makes the 50‑year material warranty enforceable.

Site left clean, daily

Magnetic nail sweep and full debris haul at the end of every working day.

Reviewed on

Tudor home with a newly completed asphalt roof

02 — Featured project

Alameda Ridge Reroof

A 1924 Tudor with three failed layers and a chronic valley leak. We took it back to the deck, replaced 140 sq ft of sheathing, and rebuilt the valleys in open metal.

Location

Alameda, Portland

Scope

Full tear-off & reroof

Duration

8 days

Assembly / Specification

Five layers between your family and the weather.

01

Structural deck & sheathing

19 mm CDX plywood · 8d ring‑shank, 150 mm field

02

Ice & water shield membrane

Self‑adhered, 900 mm at eaves · all valleys

03

Synthetic underlayment

Cap‑nailed, 150 mm laps · full field coverage

04

Standing‑seam metal panel

24 ga steel · 460 mm pans, concealed clips

05

Ridge ventilation & flashing

1:150 net free area · site‑formed pan flashing

01 — Deck

Timber roof framing and deck sheathing

19 mm CDX · 8d ring‑shank

02 — Membrane

Water shedding off a finished roof edge

900 mm eaves · all valleys

03 — Underlayment

Geometric grey roof planes

Cap‑nailed · 150 mm laps

04 — Panel

Standing seam metal roof panels

24 ga · 460 mm pans

05 — Ridge

Dark roof ridge against clouds

1:150 net free area

Evidence / Before & after

Drag the line. Nothing is retouched.

Same camera position, same time of day, photographed before demolition and after the final walk‑through. Slide across to see exactly what changed on the envelope.

Completed cedar rainscreen and new roof
1926 lap siding before restoration
Before
After
Before
1926 lap siding · failed paint, rot at sills
After
Milled cedar · factory‑primed, rainscreen
Case 01
Sellwood, Portland · 2025

03 — How it goes

Four steps, and you always know which one you are in.

01

Walk‑through

We get on the roof and into the attic. Photographs of everything, including what does not need replacing.

02

Written estimate

Line‑by‑line scope, materials named by product, and a fixed price valid for 60 days. Delivered within 48 hours.

03

Build

One crew, start to finish. Daily progress photos and a clean site every evening — no surprise sub‑contractors.

04

Handover file

Photo record of every hidden layer, warranty registration, and the paperwork your insurer will ask for.

04 — By the numbers

Seventeen years on Portland roofs.

612

Roofs completed

0

Warranty claims denied

94%

Finished on or ahead of schedule

48 hr

Average estimate turnaround

05 — In their words

The part contractors usually cannot fake.

They showed up with a written scope, a start date, and a finish date — and hit all three. The site was cleaner at 5pm than it was at 7am. I have never had a contractor make me feel this calm.

Marisa Okonjo

Homeowner · Alameda, Portland

Full tear-off & reroof

They showed up with a written scope, a start date, and a finish date — and hit all three. The site was cleaner at 5pm than it was at 7am. I have never had a contractor make me feel this calm.

Marisa Okonjo

Homeowner · Alameda, Portland

Full tear-off & reroof

I got four bids. Ridgeline was the only one who climbed into the attic, photographed the sheathing, and explained why the cheap option would fail in five years.

Daniel Reyes

Homeowner · Sellwood, Portland

Standing seam metal roof

I got four bids. Ridgeline was the only one who climbed into the attic, photographed the sheathing, and explained why the cheap option would fail in five years.

Daniel Reyes

Homeowner · Sellwood, Portland

Standing seam metal roof

We hand them the keys now. Documentation on every unit, invoices that match the estimate, and tenants who never call me about leaks anymore.

Priya Raghavan

Property manager · 6 buildings

Gutters & drainage

We hand them the keys now. Documentation on every unit, invoices that match the estimate, and tenants who never call me about leaks anymore.

Priya Raghavan

Property manager · 6 buildings

Gutters & drainage

Storm took the roof off on a Sunday night. They had it dried in before noon Monday and fully rebuilt inside a week. That is not normal in this trade.

Tom Halvorsen

Homeowner · Beaverton, OR

Emergency repair

Storm took the roof off on a Sunday night. They had it dried in before noon Monday and fully rebuilt inside a week. That is not normal in this trade.

Tom Halvorsen

Homeowner · Beaverton, OR

Emergency repair

a large metal structure with a clock on it's side

Next step

Get a written estimate this week.

One visit, one number, no pressure. Most estimates are delivered within 48 hours of the walk‑through.

Create a free website with Framer, the website builder loved by startups, designers and agencies.