Full tear-off & reroof

Alameda Ridge Reroof

A 1924 Tudor with three failed layers and a chronic valley leak. We took it back to the deck, replaced 140 sq ft of sheathing, and rebuilt the valleys in open metal.

Alameda Ridge Reroof

What we found

Three layers of asphalt, a valley that had been patched with roll roofing, and 140 square feet of sheathing soft enough to flex underfoot. The previous crew had layered over the problem twice.

How we built it

We took the roof back to bare deck, replaced the compromised sheathing, and rebuilt both valleys in open painted metal rather than woven shingle. Ice and water shield runs three feet up from the eaves and the full length of every valley.

Ridge ventilation was added to a roof that previously had none, which drops attic temperature in August and stops the winter condensation that had been staining the upstairs ceilings.

Project record

Location

Alameda, Portland

Scope

Full tear-off & reroof

Materials

Malarkey Legacy asphalt, synthetic underlayment

Duration

8 days

Completed

2026

Evidence / Same vantage point

Drag the line.

Photographed from the same position before demolition and after the final walk‑through. Nothing is retouched or staged.

After renovation
Before renovation
Before
After
Before
Three failed layers · patched valley, soft sheathing
After
Open metal valleys · new ridge ventilation
Full tear-off & reroof
Alameda, Portland
a large metal structure with a clock on it's side

Next step

Want this level of documentation on your house?

Every Ridgeline project ends with a photo record of the layers you cannot see. Start with a walk‑through.

Create a free website with Framer, the website builder loved by startups, designers and agencies.