Hillsboro Envelope Rebuild
A whole-envelope rebuild: new roof, rainscreen siding, and 14 window openings reflashed to stop a decade of water intrusion.

Whole-envelope thinking
Ten years of intermittent leaks had been chased one symptom at a time. The real problem was that the roof, the wall, and the window openings had never been detailed to work as one system.
Sequence matters
We rebuilt in the correct order: roof and its flashings first, then the weather-resistive barrier, then window reflashing with sill pans, then rainscreen furring and fibre cement cladding.
Seven weeks on site, fourteen openings reflashed, and one continuous drainage plane from ridge to grade.
Project record
Location
Hillsboro, OR
Scope
Roof, siding & windows
Materials
Fibre cement, rainscreen assembly
Duration
7 weeks
Completed
2024



Evidence / Same vantage point
Drag the line.
Photographed from the same position before demolition and after the final walk‑through. Nothing is retouched or staged.